Wys tans plasings met die etiket Amount of mine production Number of compartments (bulkhead) shafts are made function of shaft. Wys alle plasings
Wys tans plasings met die etiket Amount of mine production Number of compartments (bulkhead) shafts are made function of shaft. Wys alle plasings

Shaft Sinking

A. sectional SHAFT

1.Faktor which determine the shape of the shaft cross-section:

  •      The physical properties of ground
  •      hoisting system
  •      Material for liner
  •      Age shaft
  •      Depth of the shaft will be made















2. Factors that determine the size of the shaft

  •      Amount of mine production
  •      Number of compartments (bulkhead) shafts are made
  •      function of shaft

When the function shaft to "hoisting shafts", its size is determined by:

  •      Outer size dr hoisting equipment (cage or skip)
  •      Leisure distance (clearance) between the walls of the shaft conveyance: local steel> 150        mm, local wood> 200 mm
  •      Hoisting system (single or tandem), min. 200 mm
  •      The distance between the conveyance bunton (iron baffle) fitted with a paddling guide> 200 mm. If there are savings> 70 mm
  •      Width of bunton



Cross section of a shaft with a compartment
 






















B. Excavation methods SHAFT



Undetermined order methods, procedures and completeness excavation, dibperlukan:

  •      Characteristics of the ground:

- Very incompetent rock (loose material)

- Competent rock

- Very competent rock with cracks and fissures

- Massive very competent rock

     Type shaft (vertical or oblique)
     Cross-sectional shape and size of the shaft
     Type and size of its lining
     Excavation facilities available

Methods of excavation shaft (shaft sinking) basically consists of 3 methods:

1.Metode manual (shaft sinking by manual method)

2.Metode conventional (shaft sinking by conventional method)

3.Metode Unconventional (shaft sinking by rotary drilling)



C. SINKING PLANT & EQUIPMENT HOIST

     For excavation equipment needful shaft, either by conventional methods or not is called the sinking plant, while the hoist equipment all components / equipment needed to lift the excavation, workers and material in a quarry / mining.